News & Events

QuickLinks

Thanks to ORC Equipment: Geothermal Power Station becomes more efficient

03/30/2015

An Organic Rankine Cycle (ORC) unit engineered by Dürr Cyplan will be commissioned at a geothermal power station in Indonesia during the summer of 2015. Its purpose is to boost the Efficiency of the power station overall. Before being shipped to the Southeast Asian country, the full capacity of the ORC module was tested at the Dürr headquarters in Bietigheim using a test center that is likely to be one-of-a-kind in terms of its size.              

 

 

 

Read Dürr news

 

Contact:
Dürr Cyplan Ltd.
Carl-Benz-Str. 34
74321 Bietigheim-Bissingen
Phone  +49 7142 78-2914
Fax +49 7142 78-55 2469
Email info(at)durr-cyplan.com


Dürr News