News & Events

QuickLinks

ORC System for Geothermal Power Plant on its Way to Indonesia

11/02/2015

After the succesful final test in the technology center in Bietigheim-Bissingen, the 500 LT ORC plant has been shipped to Indonesia. In the one of a kind test stand all possible geothermal conditions were simulated and the performance was checked. The ORC system will increase the efficiency of the geothermal power plant in Indonesia and makes it possible to produce up to 10 % more electricity.

 

 

 

Contact:
Dürr Cyplan Ltd.
Carl-Benz-Str. 34
74321 Bietigheim-Bissingen
Phone  +49 7142 78-2914
Fax +49 7142 78-55 2469
Email info(at)durr-cyplan.com